Which component of‘Water Works Project’enables you to estimate the ‘quantity of water’or before the design of‘Water Works Project’for the future population ‘Pf’ for the year2045 corresponding to the present population ‘Po’ of the ‘Present year’ 2020? Search it out and write ‘that component’only. List out also the factors on the basis of which the ‘quantity of water’is estimated.

                                                    

  Answer:

 

There’re four components of water works project.

1.     Collection works

Collection works allow us to estimate the quantity of water on the basis of forecasted population.

2.     Purification works

3.     Transmission works

4.     Distribution works

           

        Factors effect the Quantity of water

1)    Forecasted population

2)    Area of the city

3)    Water consumption per capita

4)    Design Period