Answer:
There’re
four components of water works project.
1.
Collection works
Collection
works allow us to estimate the quantity of water on the basis of forecasted
population.
2.
Purification works
3.
Transmission works
4.
Distribution works
Factors effect the Quantity of water
1)
Forecasted population
2)
Area of the city
3)
Water consumption per capita
4)
Design Period