Q#:The top width of an
embankment is 2 m. Side slopes on both the sides are 2:1. Level of the top
surface of this bank is at 250 m. NSL at 30m interval are given below.
Calculate earth work by Mean Area Method.
Station |
0 |
30 |
60 |
90 |
120 |
150 |
N.S.L |
248.15 |
248.50 |
249.25 |
248.75 |
248.15 |
247.75 |
Solution#
Station
no. |
Depth |
Bd |
Sd² |
A(m²) |
Mean
area (m²) |
interval |
Q(m³) |
|
1.65 |
3.7 |
6.845 |
10.545 |
-- |
-- |
|
|
1.5 |
3 |
4.5 |
7.5 |
9.02 |
30 |
270.6 |
|
0.75 |
1.5 |
1.125 |
2.655 |
5.06 |
30 |
151.8 |
|
1.25 |
2.5 |
3.125 |
5.125 |
4.125 |
30 |
123.75 |
|
1.65 |
3.7 |
6.845 |
10.545 |
8.08 |
30 |
242.4 |
|
2.25 |
4.5 |
10.125 |
14.625 |
12.585 |
30 |
377.55 |
|
|
|
|
|
|
|
|
No comments:
Post a Comment